+4
With the Havelquartier Potsdam project, a new, unique residential and commercial concept is being created in the Potsdam development area "Nördliche Speicherstadt", directly on the banks of the Havel, which combines the highest quality materials in state-of-the-art architecture with contemporary furnishings at the highest level. A total of 5 storeys are planned in this building, as well as a technical storey on the top floor. The ground floor is a communal area that houses the foyer, a lounge/bistro, an event and multifunctional area (for up to 100 people) and a changing room with showers. Access to the building is via the barrier-free main entrance through the foyer. High ceilings and a combination of materials such as natural stone, glass and wood create a stately reception area. Fully equipped technical areas, sound insulation, thermal insulation and sun protection are standard features of the areas on offer. As the building is still under construction, future tenants can actively participate in the design of their office space and have it fitted out in consultation with the owners. Take advantage of synergy effects and choose this company headquarters.
Ground floor: bistro, multifunctional space with shower and changing area, event space
Standard floor: "open space" - no office partitions, one built-in meeting room per rental unit - implementation of a security concept (video surveillance, burglary protection, access control, intruder alarm system, etc.)
Installation of meeting rooms
Extension of the technical standard (additional laying of electrical cables, Lan cables, additional inspection shafts for retrofitting floor tanks in the office areas)
On the ground floor/entrance area: installation of a changing area with four shower cubicles and two washbasins - equipping the bistro area with additional house connection technology
Bistro: suitable for small parties (max. 40 people)
TGA equipment: grease separator, high voltage current, water, waste water
Bistro equipment planned: Counter with glasswasher, dishwasher, kitchen sink, cooling compartments for drinks and coffee machine, convection oven, small storage room for the bistro with lounge area for staff
Office space (MFG-1): approx. 2,070 m² on the 3rd and 4th floors
plus communal rental space (MFG-2): approx. 360 m² (TH, ground floor)
Underground car parking spaces: 20 of which 6 with charging station
possibly 1 smart parking space
Storage rooms in the basement
Office partition walls and office lighting (installation costs are planned by the tenant)
Heating and cooling plaster ceilings
Cavity flooring in offices and ancillary areas, raised floor in the corridor
Textile floor covering
Structured cabling (KAT 7) and data cabinets
Digital locking cylinders with integration into the access control system
Coordination with potential tenants regarding quality assurance, warranty, etc. as things currently stand, it is planned to arrange for the fit-out work to be carried out by ILB - coordination with tenant also necessary in connection with rent amount
An energy certificate has been applied for and will be available at the latest at the viewing.
The southern city centre around the main railway station is located opposite the core city centre. The district and Templiner Vorstadt are characterised by the state ministries, several scientific institutes with a focus on climate research, the new Blu leisure pool and the Herrmannswerder peninsula. Thanks to the good public transport connections, new residential parks such as Speicherstadt, Friedrich-List Park etc. have been built or are under construction within walking distance of the main railway station. The direct proximity to the Havel and the Brauhausberg are also attractive.
FREE OF COMMISSION FOR THE TENANT